The drain tile was installed yesterday and most of the backfill was completed. The plumber also installed the rough-in plumbing for under the basement slab and the electrician got power ran to the basement. Unfortunately that same evening we got 2.50″ of rain, which made a real mess out of everything! Colt came down early this morning, then he and Rob used a transfer pump to get the water out of the basement so it will dry quicker. Unfortunately the pipes floated a bit, so they will need to be reset before the floor is poured.